1 to 1 of 1
Sort by: Date | Relevance
Open and close top and bottom manways on all applicable vessels Reactors and tanks require manways open for inspection and cleaning. Bottom manways may require controlled release downward and heavy lifting to close. Piping installation and replacement Repair/replace piping and valves throughout plant site. Piping varies in size and schedule from .5 inch to 12 inch in carb
Posted 1 day ago
Email this Job to Yourself or a Friend
Indicates required fields